Olympics 2012 – The Athletes Village

Brief: To provide a team of air conditioning and ventilation specialists to be on call 24/7 in the athlete’s village throughout the duration of the Olympics 2012

About this Project

RYL provided a team of experienced engineers on site and on call 24/7 throughout the duration of the games. RYL were responsible for ensuring all air conditioning systems were working at optimum output. RYL provided immediate solution to any problems or faults and maintained all systems in the athlete village during the 2012 Olympics.